title: "The Solar Feasibility Study Checklist — What a Real Assessment Should Cover — SOLINK"
description: "Before any commercial solar project is procured, a proper feasibility study must answer twelve questions. Here's the full checklist SOLINK uses on every feasibility assessment — and why skipping items is the #1 cause of project underperformance."
lang: en
json-ld:
---

[![SOLINK](/assets/solink-logo-DvjvhsCl.png)](/)

[Home](/)[About](/about)

[Services](/services)

[Industries](/industries)

[Projects](/projects)[The Group](/group)

Platforms

[Resources](/resource-hub)[Careers](/careers)

[Get in touch](/contact)

[← Back to Resource Hub](/resource-hub)

# The Solar Feasibility Study Checklist — What a Real Assessment Should Cover

10 July 2026 · SOLINK

![The Solar Feasibility Study Checklist — What a Real Assessment Should Cover](/__l5e/assets-v1/b180d355-10e9-4d22-aacc-3849c6726d90/2024_11_Feasibility-Analysis.jpg)

A commercial solar project lives or dies on the quality of its feasibility study. Get the feasibility right and every subsequent decision — technology selection, funder engagement, EPC tender, contract structure — has a solid foundation. Get it wrong or skip steps, and issues surface at commissioning that could have been caught for a fraction of the cost at the desktop stage. This is the checklist SOLINK uses on every commercial and industrial feasibility assessment. Use it to interrogate any feasibility report you receive from a solar EPC or funder.

## **1\. Verified Consumption Profile**

Twelve months of half-hourly (or at minimum monthly) consumption data — not an annual total. Without this, no honest yield or offset analysis is possible.

## **2\. Tariff Analysis**

The current tariff must be broken down into energy, demand, network access, admin and fixed components — with each component's likely trajectory over the next five to ten years modelled explicitly.

## **3\. Roof or Land Suitability**

Structural capacity assessment for rooftop projects (asbestos, IBR gauge, purlin spacing, age); geotechnical, drainage and access review for ground-mount. Both include shading modelling from surrounding structures, vegetation and terrain.

## **4\. Grid Connection Constraints**

Confirmation of the existing supply capacity, the notified maximum demand, and the network operator's willingness to accept embedded generation at the required capacity. Grid unavailability is the fastest-growing project killer in South Africa.

## **5\. Yield Modelling**

A production simulation (PVsyst or equivalent) using site-specific solar resource data — not national averages. Include soiling, shading, inverter clipping, temperature derating and degradation over the plant's economic life.

## **6\. Business Case & Tariff Escalation Modelling**

The financial model must be sensitivity-tested against multiple Eskom / municipal tariff scenarios, discount rates, and O&M assumptions. A single-point IRR is not a business case; a range is.

## **7\. Structural, Fire & Insurance Review**

Coordination with the site's insurer is often the step that gets skipped — and then blocks the project at commissioning. Include fire suppression, cable routing, rooftop access and insurance liaison.

## **8\. Environmental & Permitting Assessment**

Environmental screening (Basic Assessment or full EIA where triggered), municipal building plan requirements, NERSA registration path, and where relevant, aviation glint & glare screening.

## **9\. BESS Sizing Sensitivity**

Even if BESS is not initially in scope, the feasibility should quantify the incremental value of a right-sized battery for peak demand reduction. Many commercial sites unlock 30% more savings by pairing solar with storage.

## **10\. Funding Structure Options**

Own & finance, PPA, lease, or solar asset refinancing (for existing assets). Each has a different balance-sheet, tax and cash-flow profile and should be compared on a like-for-like basis.

## **11\. Tax Structuring**

Section 12B modelling based on the actual asset commissioning window and ownership structure — plus interaction with any capex allowances or investment incentives already claimed.

## **12\. Risk Register & Recommendation**

A ranked risk register (technical, commercial, regulatory) with mitigation cost estimates. A recommendation that is actually a recommendation — not a menu of options.

## **How to Use This Checklist**

If any feasibility study you receive omits four or more of the twelve items above, it is not a feasibility study — it is a sales document. SOLINK conducts independent feasibility assessments that cover every point on this list. Get in touch to request one for your site.

Keep reading

## Related articles

[View all →](/resource-hub)

[

![CAA Glint & Glare Compliance — What Every Solar Developer Needs to Know](/__l5e/assets-v1/dbf2eb43-31cb-4070-ab36-2fe9c9097d8c/glint-and-glare.jpg)

10 July 2026

### CAA Glint & Glare Compliance — What Every Solar Developer Needs to Know

The South African Civil Aviation Authority requires a glint & glare assessment for any solar project within specified proximity to an airport or airstrip. Here's when it's required, what the assessment involves, and how to avoid costly redesigns.



](/resource-hub/caa-glint-and-glare-compliance-requirements)[

![Already Own Solar? Here's How to Turn Your System Into Working Capital](/__l5e/assets-v1/b51e6edf-c5da-4bf2-bfd6-f8bb0ba496d4/solink-renewable-energy-partnership-agreement.jpg)

10 July 2026

### Already Own Solar? Here's How to Turn Your System Into Working Capital

Sell your operating solar system to a specialist funder, keep the savings via a below-grid PPA, and free up working capital. Here's how SOLINK's sale-and-PPA refinancing model works — and why it means you never have to manage a solar plant again.



](/resource-hub/already-own-solar-turn-your-system-into-working-capital)[

![Understanding Eskom Demand Charges — and How Solar & BESS Reduce Them](/__l5e/assets-v1/d9849584-7d73-4c2c-873b-f935f26bbd56/solink-solar-panel-battery-storage-system-south-africa.jpg)

10 July 2026

### Understanding Eskom Demand Charges — and How Solar & BESS Reduce Them

For most C&I businesses, demand charges are 30–40% of the electricity bill and don't reduce with solar alone. Here's how demand charges work, why battery storage matters, and where the real savings live.



](/resource-hub/understanding-eskom-demand-charges-and-how-solar-bess-reduce-them)

Newsletter

## Renewable energy insights, straight to your inbox

Independent commentary on solar, BESS, wheeled energy and the South African electricity market.

Subscribe

I agree to receive marketing communications from SOLINK. You can unsubscribe at any time. 

SOLINK

South Africa's independent renewable energy consultant, project developer and facilitator — engineering bankable solar, BESS and wheeled energy solutions for commercial and industrial businesses.

[Start a project](/contact)

Services

-   [Overview](/services)
-   [Feasibility Studies](/services/feasibility-analysis)
-   [Battery Storage](/services/battery-storage)
-   [Wheeled Energy](/services/wheeled-energy)
-   [Glint & Glare](/services/glint-and-glare)

Company

-   [About](/about)
-   [The SOLINK Group](/group)
-   [Projects](/projects)
-   [Careers](/careers)
-   [Contact](/contact)
-   [LinkedIn](https://www.linkedin.com/company/solink-power-procurement/)
-   [Resource Hub](/resource-hub)

Platforms

-   [SOLINK Procurement](https://www.solinkplatform.co.za/login/)
-   [SOLTRAK](https://app.soltrak.co.za/)
-   [SOLINK Core](/core)

Contact

Cape Town

Black River Park, Fir St, Observatory, Cape Town, 7925

[021 300 0485](tel:+27213000485)

Johannesburg

3rd Floor, Unit T, 165 West St, Sandown, Sandton, 2031

[010 500 7675](tel:+27105007675)

[info@solink.co.za](mailto:info@solink.co.za)

© 2026 SOLINK. All rights reserved.· [Privacy Policy](/privacy-policy)

Independent renewable energy advisory · South Africa